Skip to main content
Camp

Camp Walter Scott Needs and Work List

By March 4, 2014April 16th, 2015No Comments

Camp Walter Scott Camp Needs and Work List

2014 Work days at Camp Walter Scott
Jump To
[zilla_button url=”#WorkP” style=”grey” size=”small” type=”square”] Work Projects Spring [/zilla_button][zilla_button url=”#CapImp” style=”red” size=”small” type=”square”]Capital Improvements/Wish List [/zilla_button][zilla_button url=”#Gifts” style=”green” size=”small” type=”square”] Gifts given in 2013 [/zilla_button] April 12
May 3
May 17
September 13
October 4
November 8

Call us at 217-739-2332
To Volunteer!

Documents

Download PDF files
campworkspring2014

campcapitalneeds2014

[zilla_alert style=”blue”]

Work Projects Spring 2014

  • 1. Spring cleaning – retreat house, cabins, etc
  • 2. Inventory/repair chairs in dining hall
  • 3. Clean ceiling fans in dining hall & replace ceiling vents
  • 4. Repairs on any/all shelters, including tarps
  • 5. Repair ceiling – north show house, west side
  • 6. Repair door latch – cabin 2
  • 7. Clean the volleyball court
  • 8. Trim tree branches
  • 9. Add ropes and floats to swim area
  • 10. Wash outside of retreat house, clean gutters
  • 11. Clean and repair gutter and soffit – NW of dining hall kitchen
  • 12. Add gravel to parking areas & roads to shelters
  • 13. Add more gravel to the parking to near the retreat house
  • 14. Add sand to the beach
  • 15. Check all trails – add mulch/wood chips to trails
  • 16. Build bench at frog pond
  • 17. Rebuild the labyrinth
  • 18. Dining hall – new entry doors
  • 19. Power wash all metal roofs
  • 20. Build a ramp on west side of Cabin 1 + path of stepping stones
  • 21. Cabins, #1 and #2 – insulation, weather stripping, sealing cracks, etc
  • 22. Cut trees and split firewood – we can always use more
  • 23. Install metal roof – north side – small shelter
  • 24. Install metal roof on the shop
[/zilla_alert]
[zilla_alert style=”red”]

Capital Improvements/Wish List

  • 1. New curtains in dining hall and cabins
  • 2. New couches and chairs in Cabin #1 and Cabin #2
  • 3. New flooring in common areas in Cabin #1 and Cabin #2
  • 4. New air conditioner for Cabin #1
  • 5. Copy machine for camp office
  • 6. Accessibility project – dining hall – exterior doors, grab bars in restrooms
  • 7. New ceiling light fixtures and fans – dining hall
  • 8. New chairs for the dining hall
  • 9. Concrete parking pad near dining hall ramp + front walk
  • 10. Clocks for all 3 levels of the dining hall $50
  • 11. Signage for parking areas
  • 12. New lightweight tables for the dining hall – 20 rectangular tables, 8 feet long + 15 round tables
  • 13. Menards gift cards – unlimited amount
  • 14. Rural King gift cards – unlimited amount
  • 15. Construct a new shelter – prototype –
  • 16. Recreation equipment/areas – north side – create/update volleyball court & basketball court
  • 17. More aeration pumps for the lake
  • 18. New 30 cup coffee pot
  • 19. Long range consideration – new distribution box – electrical – dining hall
[/zilla_alert]
[zilla_alert style=”green”]

Gifts given in 2013

  • 1. New mower $6,000
  • 2. Air conditioning for the dining hall $15,000
  • 3. Dehumidifiers for cabins $400
  • 4. Water fountain for dining hall – $900
[/zilla_alert]

spicate

spicate