Camp Walter Scott Camp Needs and Work List
2014 Work days at Camp Walter Scott
Jump To
[zilla_button url=”#WorkP” style=”grey” size=”small” type=”square”] Work Projects Spring [/zilla_button][zilla_button url=”#CapImp” style=”red” size=”small” type=”square”]Capital Improvements/Wish List [/zilla_button][zilla_button url=”#Gifts” style=”green” size=”small” type=”square”] Gifts given in 2013 [/zilla_button]
April 12
May 3
May 17
September 13
October 4
November 8
Call us at 217-739-2332
To Volunteer!
Documents
Download PDF files
campworkspring2014
campcapitalneeds2014
[zilla_alert style=”blue”]
Work Projects Spring 2014
- 1. Spring cleaning – retreat house, cabins, etc
- 2. Inventory/repair chairs in dining hall
- 3. Clean ceiling fans in dining hall & replace ceiling vents
- 4. Repairs on any/all shelters, including tarps
- 5. Repair ceiling – north show house, west side
- 6. Repair door latch – cabin 2
- 7. Clean the volleyball court
- 8. Trim tree branches
- 9. Add ropes and floats to swim area
- 10. Wash outside of retreat house, clean gutters
- 11. Clean and repair gutter and soffit – NW of dining hall kitchen
- 12. Add gravel to parking areas & roads to shelters
- 13. Add more gravel to the parking to near the retreat house
- 14. Add sand to the beach
- 15. Check all trails – add mulch/wood chips to trails
- 16. Build bench at frog pond
- 17. Rebuild the labyrinth
- 18. Dining hall – new entry doors
- 19. Power wash all metal roofs
- 20. Build a ramp on west side of Cabin 1 + path of stepping stones
- 21. Cabins, #1 and #2 – insulation, weather stripping, sealing cracks, etc
- 22. Cut trees and split firewood – we can always use more
- 23. Install metal roof – north side – small shelter
- 24. Install metal roof on the shop
[zilla_alert style=”red”]
Capital Improvements/Wish List
- 1. New curtains in dining hall and cabins
- 2. New couches and chairs in Cabin #1 and Cabin #2
- 3. New flooring in common areas in Cabin #1 and Cabin #2
- 4. New air conditioner for Cabin #1
- 5. Copy machine for camp office
- 6. Accessibility project – dining hall – exterior doors, grab bars in restrooms
- 7. New ceiling light fixtures and fans – dining hall
- 8. New chairs for the dining hall
- 9. Concrete parking pad near dining hall ramp + front walk
- 10. Clocks for all 3 levels of the dining hall $50
- 11. Signage for parking areas
- 12. New lightweight tables for the dining hall – 20 rectangular tables, 8 feet long + 15 round tables
- 13. Menards gift cards – unlimited amount
- 14. Rural King gift cards – unlimited amount
- 15. Construct a new shelter – prototype –
- 16. Recreation equipment/areas – north side – create/update volleyball court & basketball court
- 17. More aeration pumps for the lake
- 18. New 30 cup coffee pot
- 19. Long range consideration – new distribution box – electrical – dining hall
[zilla_alert style=”green”]
Gifts given in 2013
- 1. New mower $6,000
- 2. Air conditioning for the dining hall $15,000
- 3. Dehumidifiers for cabins $400
- 4. Water fountain for dining hall – $900