Updated CWS Camp Needs and Work List
2014 Work days at Camp Walter Scott
Jump To
[zilla_button url=”#WorkP” style=”grey” size=”small” type=”square”] Work Projects Spring [/zilla_button][zilla_button url=”#CapImp” style=”red” size=”small” type=”square”]Capital Improvements/Wish List [/zilla_button][zilla_button url=”#Gifts” style=”green” size=”small” type=”square”] Gifts given in 2013 [/zilla_button]
Next Work Days
May 17
September 13
October 4
November 8
Call us at 217-739-2332
To Volunteer!
Documents
Download PDF files
campworkspring2014
campcapitalneeds2014
[zilla_alert style=”white”]
Work Projects Spring 2014
- 1. Spring cleaning – retreat house, hogans, etc
- 2. Inventory/repair chairs in dining hall
- 3. Dining hall replace ceiling vents
- 4. Repairs on any/all shelters, including tarps
- 5. Repair ceiling – north show house, west side
- 6. Clean the volleyball court
- 7. Add ropes and floats to swim area
- 8. Wash outside of retreat house, clean gutters
- 9. Clean and repair gutter and soffit – NW of dining hall kitchen
- 10. Add gravel to parking areas & roads to shelters
- 11. Add more gravel to the parking to near the retreat house
- 12. Check all trails – add mulch/wood chips to trails
- 13. Build bench at frog pond, repair foot bridge to pond.
- 14. Rebuild the labyrinth
- 15. Dining hall – new entry doors
- 16. Power wash all metal roofs
- 17. Build a ramp on west side of Cabin 1 + path of stepping stones
- 18. Cabins, #1 and #2 – insulation, weather stripping, sealing cracks, etc
- 19. Cut trees and split firewood – we can always use more
- 20. Install metal roof – north side – small shelter
- 21. Install metal roof on the shop
- 22. Replace red bud tree in front of Dining Hall
- 23. Paint brown benches in entry to Dining Hall
- 24. Clean around street sign, remove old stump.
- 25. Weed the flower beds at retreat house.
[zilla_alert style=”red”]
Capital Improvements/Wish List
- 1. New curtains in dining hall and cabins
- 2. Copy machine for camp office
- 3. Accessibility project – dining hall – exterior doors, grab bars in restrooms
- 4. New ceiling light fixtures and fans – dining hall
- 5. New chairs for the dining hall
- 6. Concrete parking pad near dining hall ramp + front walk
- 7. Clocks for all 3 levels of the dining hall $50
- 8. Signage for parking areas
- 9. New lightweight tables for the dining hall – 20 rectangular tables, 8 feet long + 15 round tables
- 10. Menards gift cards – unlimited amount
- 11. Rural King gift cards – unlimited amount
- 12. Construct a new shelter – prototype –
- 13. Recreation equipment/areas – north side – create/update volleyball court & basketball court
- 14. More aeration pumps for the lake
- 15. New 30 cup coffee pot
- 16. Long range consideration – new distribution box – electrical – dining hall
[zilla_alert style=”green”]
Gifts given in 2013
- 1. New mower $6,000
- 2. Air conditioning for the dining hall $15,000
- 3. Dehumidifiers for cabins $400
- 4. Water fountain for dining hall – $900